ROAD CONDITIONS MAP
To view a larger image of the 2024 Road Conditions Map click here or click the map.
Pavement Management Group (PMG) was contracted by the City of Munroe Falls to provide pavement management services for our 24-centerline mile (46 lane mile) roadway network. This report provides a thorough definition of the inspection process performed as well as the condition results of the project.
PMG also provided an interactive map with videos of road conditions for each street. Click on any street shown to watch the video. Click here for the interactive map.
To read the full report provided by Pavement Management Group click here
CRACK SEALING STREETS
Crack sealing is the process of placing an adhesive sealant into cracks on the pavement surface, preventing the infiltration of moisture and non-compressible materials into the pavement thereby extending the life of the pavement.
Please be sure to use caution whenever you see crews working on roadways.
Street Improvements 5-year Plan
The City has developed a tentative 5-year Street Improvement Plan. This color coded map includes projected improvements to Main St (Rt. 91) by ODOT in 2028 and the bridge deck replacement over the Cuyahoga River by ODOT in 2026. Click here to view the map.
The City has developed a tentative 2nd 5-year Street Improvement Plan. This color coded map shows projected improvements from 2030 to 2034. Click here to view the map.